A refurbishment and re-configuration of an existing city centre research four storey building for the University of Cambridge which provides new wet and dry laboratory spaces for the Toxicology Unit, support spaces, an imaging suite, write up spaces and shared meetings rooms, cafeteria and admin spaces.
Furniture Group were responsible for the manufacture and installation of a bespoke reception desk. Wall panelling throughout the building in various locations and benches in the cafeteria area.
Project Hadar